Welded Steel Tube

1.Product Introduction of the welded steel tube: Basic information: Model number: 210/304/304L/316/316L Type: welded Standard: ASTM, GB, JIS Technique: Hot Rolled or Cold Rolled Surface treatment: Pickling, annealing, polishing, bright. Lead Time:7-15 days after deposit Diameter: O.D 6-630mm ;...

Send Inquiry
Product Details

1.Product Introduction of thewelded steel tube:

Basic information:

Model number: 210/304/304L/316/316L

Type: welded

Standard: ASTM, GB, JIS

Technique: Hot Rolled or Cold Rolled

Surface treatment: Pickling, annealing, polishing, bright.

Lead Time:7-15 days after deposit

Diameter: O.D 6-630mm ; W.T: 1-40mm or customized

Length: 1000-6000mm or Customized, We will custom saw cut to length.

Shape : Square, Rectangular, Round

Application: Industry/Chemical Equipment

Payment term: T/T,L/C, Western Union

Main market: The Americas, Africa, Europe, South Asia

2. Specifications of welded steel tube

Size

Outer Diameter

10.3~610mm

Wall Thickness

1.24~52.37mm

Length

Less Than 12m sizes can be customized

Material

201/201/304/304L/316/316L/309/310/316/430,ect

Standard

GB12771-91, ASTM A1053/A1053M-06, ASTM A268/A268M-05A, ASTM A269-07, ASTM A270-03A, ASTM A312/A312M-06, ASTM A358/A358M-05, ASTM A632-04, ASTM A789/A789M-05b, ASTM A790/A790M-05b, ASTM A872/A872M-07A, ASTM A949/A949M-01(2005), ASTM A999/A999M-04A

Usage

construction building material, curtain wall bracket, guardrail/handrailing material, petroleum oil and gas transmission, coal,    decoration, chemical engineering, food processing, agricultural use, indoor pipeline, water heater, boiler, bathtub etc.

Ends Protector

plastic pipe cap on both ends

Technique

Cold Rolled

Surface Finished

Polishing grit400/grti600/grti800 ect

Section Shape

Round, Bevled

Package

Inner Packing:Caps at both ends, steel strong trips on every bundle,
Outer Packing:PE Wrapping outside,
Export Standard Packing Method(Bundle with steel strip, steel pallet),shipped with 20' or 40' container or in bulk carrier.
As Customers' Request.

Port

Xingang Port,Tianjin, China

Date of Delivery

According To The Quantity And Specification Of Each Order

Payment

L/C, T/T, Western Union, Alibaba Trade Assurance

3.Product Processing of the welded steel tube

59.jpg

FAQ

Q:Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment

4.Recommendations

Hot Tags: welded steel tube, wholesale, cheap, price, buy discount
Related Products
Inquiry